Jan De Nul Group offers specialised services for the the offshore renewable energy market. Whether it concerns seabed preparation, scour protection, subsea cables, umbilicals, monopile or jacket foundations, wind turbines or offshore substations: everything is always tailored to the needs of the client and on an EPC-basis if required. Do you want to be part of our international team?
As Installation Analysis Engineer, you provide technical support for our Heavy Lift Installation Vessels, from early development until project execution. You identify the engineering requirements of the lifting & transport process and help define and detail execution methods. Together with the Installation Manager or Engineering Manager you start and follow up the studies, if necessary in cooperation with external departments or engineering offices.
Your tasks and responsibilities include:
You're an engineer (civil, structural or naval architect) with an affinity for heavy lifting in the construction or offshore sector. You have strong analytical skills and you work very detailed.
Understanding of hydrodynamic aspects of marine structures, wave theories, etc. is beneficial. Also knowledge and experience with Orcaflex and/or CAD software is beneficial.
You'll work from the office in Aalst, but make short trips abroad on a regular basis.